Agreements / Decisions
Intended for use as:
- Shared workspace size to collaborate for system integration
- documentation for inter-team agreements
ECAD
As the used ECAD Tooling the following options are investigated and KiCAD 8 is decided to be used as the ECAD tool for obat. Mainly because it is more suitable for the future as it is a thriving open source project and not discontinued as EAGLE. Also by its FOSS nature and the ecosystem "data ownership" is placed at obat project and not a third party company. With EAGLE being discontinued officially by 7th of June 2026 it is not seen as a future safe option for a new project.
- AUTODESK Eagle
- Disadvantages:
- discontinued (announced by Autodesk to be discontinued by 7th June 2026)
- little to no updates
- Not free, license required (educational license available)
- proprietary software (Autodesk might enforce online storage)
- licensing might change at any time
- footprints and symbols are "linked" atomically in library (depending on opinion this can be good)
- Advantages:
- used at by others at HFU
- good library support
- nice part search bulk editing for big projects
- Disadvantages:
- KiCAD 8
- Disadvantes:
- Currently not used by many other at HFU
- Advantages:
- Free (no license) and free as in freedom
- Open Source
- Active Project, Regular Updates and new versions
- good library support
- Footprint and Schematic symbols separated in libraries
- EAGLE project importer
- (softpoint) handy tools and calculators, it just works
- Disadvantes:
Meeting Agreements
18. Apr 2024
- PC / Controller
- separation of realtime / non-realtime code into distinct packages, which have a defined interface. This separation shall allow a change of the realtime code for harder realtime constraints. (Port of language, port to other hardware).
- PowerSupplySink
- PI(D) controller for constant current or other controller type is suited better?
- Enclosure
- Temperature control loop should be managed in the PC / Controller
- Interface definition of actuators and sensors is required to be shared / agreed
- Power for temperature control can be sourced from 24V power source by using isolation DC/DC amplifiers for other voltages.
- safety disconnect can be achieved by using a control signal (Steuersignal) to switch a relay.
27. Mar 2024
- No switch/sensor at mechnical enclosure to check if enclosure is open or
closed, which has to be read by other components.
- Safety can be ensured using a concept similar to a "unloosable screw" (ger. unverlierbare Schraube)
- Connections from Measurement and PowerSupplySink into enclosure
- Connected and disconnected mechanically by opening and closing the enclosure
- Connections for 4 Wire sensing:
+
and-
connections with high current capability for power delivery+
and-
connections in parallel with normal current capability
- Heating and Cooling
- Power for heating cooling is considered part of the enclosure. Other components must only provide "information" for heating and cooling.
- Temperature sensing
- [0V 5V] interface with linear mapping to temperature interval [T_min T_max]
- Stop Button
- ESU has
connect
anddisconnect
button for "normal" operation - Before ESU is a stop button/lever disconnecting the ESU + DUT
- Cooling, Heating & Ventilation is not stopped by the stop button
- Color, size and type of button/lever must be investigated to be in accordance with regulations. (CE Examination)
- ESU has